Below are several of the projects and construction works in which Inaccés has participated and that we feel are interesting to mention for their uniqueness, their technical difficulty, their complexity of implementation by the application of innovative systems, or their significance for society as a whole.

Sanitation of a landslide zone in a hard to reach area.
Location: Montserrat (Barcelona).
Year: 2007

Strengthening rocky volumes in the climbing area
Location: Montserrat (Barcelona).
Year: 2005

Avalanche protection at the Tavascan ski station
Location: Lladorre (Lleida).
Year: 2007
2014
Monistrol de Montserrat (Barcelona)
Strengthening and stabilization of various rock volumes on the Mountain of Montserrat (Barcelona);
2013
Baqueira Beret (Lleida)
Protection against avalanches on road C-28, Baqueira-Tonyon section, Naut Aran (Lleida);
2011
Esterri d’Àneu (Lleida)
Protection against avalanches in Puerto de la Bonaigua C-28
2010
Queralbs (Girona)
Alpine work at the Núria ski resort
2010
Port Ainé (lleida)
Port Ainé ski resort (Lleida)
2010
La Peülla (Lleida)
Road C-28.Port de la Bonaigua (LLeida),
2009
Alp (Girona)
Avalanche protection at the new Cap de Comella chairlift. La Molina ski resort.
2007
Panticosa (Huesca)
Avalanche protection at Panticosa Spa.
2007
Tavascán (Lleida)
Avalanche protection at the Tavascán ski station.
2006
Cerler (Huesca)
Demolition of rocks and strengthening of the land for the installation of a new chairlift in Cerler
2006
Puerto de Belagua (Navarra)
Avalanche protection on the NA-140
2005
Puerto de Belagua (Navarra)
Avalanche protection at the NA-140 Area Headquarters and snowdrift protection at various locations.
2004
Puerto de Belagua (Navarra)
Erection of snowdrifts for the protection of the NA-140.
2003
Puerto de Belagua (Navarra)
Erection of snowdrifts for the protection of the NA-140 in the Abaurreas Alta area.
1998
Astún (Huesca)
Avalanche protection at the Astún ski station.
1998
Baqueira Beret (Lleida)
Protection against avalanches on road C-28, Baqueira-Beret section
1997
Canfranc (Huesca)
Erection of snowdrifts for the protection of the NA-140 in the Abaurreas Alta area.
We unite processes, leading technologies and talented individuals focused on safety
Conditioning slopes on the N-260 road. - This action is part of the project of the Ministry of Transport, Mobility,… + read more
The vital importance of installing rockfall barriers on railway tracks. - Safety is one of the most critical aspects in railway transportation. In the… + read more
First 9,000 KJ dynamic barrier set up in the Iberian Peninsula. - At the end of last year, INACCÉS completed the installation of the first… + read more
Emergency work due to the detachment of a retaining wall on the Sa Calobra road - The Ma-2141 road, an emblematic road of the Serra de Tramuntana, suffered a… + read more
Inaccés Geotècnica Vertical, S.L., offers services of slope and ground stabilization and reinforcement, and protection against rockfalls and avalanches even in areas with extreme access.