For ground consisting of compact or very resistant materials, an alternative to blasting is demolition by applying expansive cement that are introduced into previously drilled holes, which result in the breakage of the blocks along the lines of the mesh perforations provided.
The delayed action of these materials (12 to 24 hours) requires that the areas affected are protected against falling blocks.
It is usually used where blasting is not possible.

Elimination of an unstable part of an unstable overhanging block by means of expansive cement. Rubió wind farm[2]
Location: Rubió (Barcelona).
Year: 2004

Block breaking
Location: Monistrol de Montserrat (Barcelona).
Year: 2001

Block breaking.
Location: Monistrol de Montserrat (Barcelona).
Year: 2001
We unite processes, leading technologies and talented individuals focused on safety
Conditioning slopes on the N-260 road. - This action is part of the project of the Ministry of Transport, Mobility,… + read more
The vital importance of installing rockfall barriers on railway tracks. - Safety is one of the most critical aspects in railway transportation. In the… + read more
First 9,000 KJ dynamic barrier set up in the Iberian Peninsula. - At the end of last year, INACCÉS completed the installation of the first… + read more
Emergency work due to the detachment of a retaining wall on the Sa Calobra road - The Ma-2141 road, an emblematic road of the Serra de Tramuntana, suffered a… + read more
Inaccés Geotècnica Vertical, S.L., offers services of slope and ground stabilization and reinforcement, and protection against rockfalls and avalanches even in areas with extreme access.