These are carried out in location that are inaccessible to machinery (bulldozers, diggers), usually at extreme altitudes, with the help of climbing techniques.
We use levers as well as hydraulic jacks and hydraulic hammers.

Scaling of rocks mass on the highway
Location: Highway C-16, Terrassa-Manresa (Barcelona).
Year: 2017

Scaling Scaling of rocks mass on the C-16 dual carriageway
Location: Berga (Barcelona).
Year: 2006

Manual draining of unstable blocks..
Location: Montserrat (Barcelona).
Year: 2007

Removal of rocky hillsides
Location: Cliff of Mao harbour. (Illes Balears)
Year: 2016

Removal of unstable rocks mass on a railway.
Location: Manresa (Barcelona).
Year: 2016

Location: C-17 dual carriageway, Vic-Ripoll.
Year: 2011

Manual scaling of rocky hillsides
Location: Berga (Barcelona).
Year: 2010

Scaling
Location: Llavaneres (Barcelona)
Year: 2020
We unite processes, leading technologies and talented individuals focused on safety
Conditioning slopes on the N-260 road. - This action is part of the project of the Ministry of Transport, Mobility,… + read more
The vital importance of installing rockfall barriers on railway tracks. - Safety is one of the most critical aspects in railway transportation. In the… + read more
First 9,000 KJ dynamic barrier set up in the Iberian Peninsula. - At the end of last year, INACCÉS completed the installation of the first… + read more
Emergency work due to the detachment of a retaining wall on the Sa Calobra road - The Ma-2141 road, an emblematic road of the Serra de Tramuntana, suffered a… + read more
Inaccés Geotècnica Vertical, S.L., offers services of slope and ground stabilization and reinforcement, and protection against rockfalls and avalanches even in areas with extreme access.
