The barriers, or dynamic screens, are the ones that absorb the energy resulting from a rock fall by means of the various elements of which it consists (cable mesh panels, dissipaters or brakes, etc.)
The absorption of high energy values will result from deformability under load.
The barrier construction process requires, in addition to the design task and theoretical simulation, testing for full scale rock impacts, under certain conditions, to ensure the ability to absorb energy for which they have been designed, without it producing significant damage to the structure.
Installing of two 2,000 kJ dynamic barriers (60 + 50 metres) and a 5-metre-high 3,000 kJ barrier (90 metres) to protect against rockslides.
Location: Lleida - La Pobla de Segur Line.
Year: 2009
Block stopped by dynamic barrier.Pau Casals motorway (C-32). .
Location: Vallcarca (Barcelona).
Year: 2009
Location: Montserrat Rack Railway (Barcelona)
Year: 2009
Landslide protection barrier with an energy absorption capacity of 5,000 kJ, 5 meters high.
Location: La Palma de Cervelló (Barcelona).
Year: 2011
750 kj, 4-metre-high dynamic anti-landslide barrier.
Location: Cantera Apario.
Year: 2007
Location: Montserrat Rack Railway (Barcelona).
Year: 2009
Location: Montserrat Rack Railway (Barcelona).
Year: 2009
Landslide protection barrier with an energy absorption capacity of 5,000 kJ, 6 meters high.
Location: A-15 Leizarán dual carriageway.
Year: 2009
Location: Línea Lleida - La Pobla.
Year: 2009
Landslide protection barrier with an energy absorption capacity of 5,000 kJ, 6 meters high.
Location: A-15 Leizarán dual carriageway.
Year: 2009
Location: A-15 Leizarán dual carriageway.
Year: 2009
Anclajes
Location: Lleida - La Pobla Line.
Year: 2009
Location: Mining facility
Year: 2009
Location: Puerto de Lizarraga (Navarra)
Year: 2010
Installing the barrier
Location: Montserrat (Barcelona).
Year: 2010
Dynamic barrier installed in the form of a screen on the cliff to protect the temple of Saptanrunghi.
Location: Saptanrunghi (India).
Year: 2015
Slope strengthening along the front of the tunnel with sprayed concrete and rockfall protection with a 5,000 kj dynamic barrier.
Location: Lleida - La Pobla Line.
Year: 2009
5,000 kJ dynamic protection barrier with 8-metre-long posts inserted horizontally into the mouth of the tunnel as a protective screen.
Location: Lleida - La Pobla Line.
Year: 2011
5,000 kJ dynamic protection barrier with 8-metre-long posts inserted horizontally into the mouth of the tunnel as a protective screen.
Location: Lleida - La Pobla Line.
Year: 2011
Location: Mallorca.
Year: 2010
Protection for the Montserrat Rack Railway with a dynamic barrier
Location: Montserrat (Barcelona).
Year: 2009